Application

Remote Power & Infrastructure

Remote facilities, telecom, community assets and infrastructure where grid access is limited, weak or delayed.

Industry context

Typical loads and project questions

Examples are indicative only and do not represent completed NUSLUME projects.

01

Load profile

Continuous and intermittent loads

02

Criticality

Communications and auxiliary systems

03

Site conditions

Access, environment and maintenance constraints

04

Operating target

Autonomy and backup requirements

NUSLUME method

Combine the right assets for the operating need

Potential assets may include PV, BESS and PCS, genset, grid interface, AC distribution, EMS, monitoring and segmented loads.

Assess

Confirm load data, current supply, site constraints and project stage.

Configure

Develop an illustrative architecture and operating modes.

Validate

Review interfaces, suppliers, compliance needs and delivery responsibilities.

Project assessment

Information to provide

  • Project location and application
  • Current power source and electrical arrangement
  • Load profile, maximum demand and critical loads where known
  • Operating hours, growth expectations and resilience target
  • Project stage, timing and site constraints
Get started

Start with the load

Tell us what needs to be powered, where the site is located and what operating constraints must be considered.