Solar self-consumption
Increase utilisation of on-site renewable generation through coordinated load and storage operation.
Distributed energy systems coordinate on-site generation, battery storage, power conversion, grid connection and controllable loads behind a single project-specific operating strategy.
Indicative capability only; final scope and configuration require project assessment.
Increase utilisation of on-site renewable generation through coordinated load and storage operation.
Use BESS and controls to manage site peaks, operating windows and grid import profiles where appropriate.
Peak control and operating-window management.
Metering, protection, export limits, communications and site electrical interfaces are assessed against the project and applicable requirements.
Solar PV, BESS, PCS / hybrid inverters, grid interfaces, generators and EMS are selected and validated project by project.

Conceptual system architecture. Final topology, protection, switching, equipment selection and compliance requirements are subject to project-specific engineering assessment.
The EMS coordinates and controls operation. Primary electrical power flows through the power conversion and distribution architecture.
Tell us what needs to be powered, where the site is located and what operating constraints must be considered.