Energy Sources
Solar PV, BESS, genset and optional grid supply configured around site operating requirements.
A coordinated architecture for sites using multiple energy sources, with dispatch logic based on operating priorities and constraints.
Indicative capability only; final scope and configuration require project assessment.
Solar PV, BESS, genset and optional grid supply configured around site operating requirements.
PCS / hybrid inverter architecture with AC-coupled, DC-coupled or hybrid approaches assessed project by project.
EMS coordinates source priority, battery SOC, dispatch schedules, generator logic, monitoring and alarms.
Grid interaction, switching, metering and protection are defined subject to network and project compliance requirements.
Equipment brands and interfaces are selected and validated project by project.

Conceptual system architecture. Final topology, protection, switching, equipment selection and compliance requirements are subject to project-specific engineering assessment.
The EMS coordinates and controls operation. Primary electrical power flows through the power conversion and distribution architecture.
Tell us what needs to be powered, where the site is located and what operating constraints must be considered.