Assessment
Site demand and critical-load assessment.
SAPS concepts developed from load data, autonomy targets, site conditions and applicable Australian project requirements.
Indicative capability only; final scope and configuration require project assessment.
Site demand and critical-load assessment.
PV, storage and firming-source configuration.
Autonomy, reserve and operating-mode definition.
Equipment approvals, licensed work and compliance requirements confirmed per project.
Equipment brands and interfaces are selected and validated project by project.

Conceptual system architecture. Final topology, protection, switching, equipment selection and compliance requirements are subject to project-specific engineering assessment.
The EMS coordinates and controls operation. Primary electrical power flows through the power conversion and distribution architecture.
Tell us what needs to be powered, where the site is located and what operating constraints must be considered.